More later.......
Monday, October 15, 2012
Thursday, October 11, 2012
The building is built. Day before yesterday the workers showed up around 8:30am and began to work. It didn't rain but there was a lot of low lying clouds and fog so mist was the issue and everything was wet. But this did not hamper the work at all.......
That was the end of that day and the yesterday they showed up and finished the job with much better weather.......
I will more than likely build a 10' deck in front of this for tables and chairs at some point but for now I think I will just throw up some steps for the time being. Now for the electrical and water.
More later.......
More later.......
Monday, October 8, 2012
Saturday, October 6, 2012
I ordered my 20gal. kettles
from Stout Tanks & Kettles back on Aug 7th, 2012 and have been told that I
should be getting them sometime end of Nov - Dec. They will look like theses.......
I have most everything else ready to be put together and be
waiting on the kettles when they arrive. I will be posting the pictures of what
I have thus received as well as a list here in there of all the components.
First I would like to post the Electrical Diagram that Mr. Muth generated for
this build.......
I have added a thing
or two but will not change the overall intent and use of this diagram. Pretty
much what you see will be with exception of different colored lighting scheme
and the addition of two green lights to go with the red indicator lights for the
selector switches used for the 5500w ULWD elements. As well as the addition of
the digital voltage and amperage displays which will also involve two small
transformers, two ac -to- dc convertors, and one 50a AC Shunt.
Here is a sample layout of the front of the control panel of most of the items I have already received.......
Here is a sample layout of the front of the control panel of most of the items I have already received.......
More later.......
Subscribe to:
Posts (Atom)