Sunday, December 16, 2012

I added a widget to the blog where one can subscribe and get email alerts when I update for all who are interested.......

Now on to the latest update!

I spent this weekend sanding, conditioning, staining, and sealing with polyurethane the brew-stand.

Here is with just the gun-stock stain.......


And here is after the poly-coats.......



And here is the cork tiles resting at room temperature to settle out flat before I peel the backs off and adhere them to the top of the table. I'm doing this for the protection against the heat to the top of the wooden table.......


Once I adhere the tiles to the top of the table I will also seal any gaps and contact points between the tiles with heat resistant silicone.

More later.......